New: Ask BB. A bid assistant that only does bids, and asks before it saves. See it work
Industries

Paving and construction

Sealed bids, bonds, plan sheets and addenda, kept in order from the first notice to the bid opening.

Illustration: a paving machine laying a fresh road between traffic cones, with a bid card above it
The market

Who buys paving and construction, and how.

Typical buyers

  • City public works departments
  • County highway departments
  • State transportation agencies
  • School district facilities offices
  • Water and sewer authorities

How they buy

  • Invitation for bids (IFB)
  • Unit-price bid schedules
  • Design-bid-build packages
  • Annual paving term contracts
Win and lose

What wins in paving and construction.

The same few things decide most bids in this trade. BotBid keeps each one in front of the person who owns it.

What wins

  • A complete, responsive bid form with every line priced in the unit the buyer asked for
  • Bid bond, licenses and insurance that match the stated amounts and dates
  • Acknowledgment of every addendum, on the form the buyer requires

Common traps

  • A late addendum that changes a material specification or quantity
  • A mandatory pre-bid meeting missed or attended by the wrong person
  • Physical delivery planned for the due date instead of the day before

What BotBid watches

  • Addendum watch compares each new version and lists what changed, with the dates that moved
  • The requirements matrix tracks bonds, licenses and forms as must-haves until a person marks them met
  • Expiry dates flag a license or insurance certificate that lapses before the work would start
A bid, start to finish

Sample bid: Street resurfacing, Phase 2

Sample dataDue in 12 days

Street resurfacing, Phase 2City of Brightwater · bid by Ridgeline Civil Works

  1. Day 1Radar scores the bid 92 because the scope, county and work codes match the company profile.
  2. Day 3The bid plan works back from hand delivery and assigns the bond request to the office manager.
  3. Day 6Addendum 2 changes the binder grade. The supplier quote step reopens and the acknowledgment is added.
  4. Day 10Pre-flight finds the signed bid bond missing from the package and holds the Ready lock.
  5. Day 11The owner approves the price, signs in ink and records the delivery receipt.

Fictional company, agency and bid.

app.botbid.ai/documents/planSample data
Sample BotBid screen: Addendum comparison. Fictional companies, people and figures.

Page 47

Addendum watch

Read transcript

Illustrative narration with fictional examples. Review source requirements and approve prices, signatures and submissions yourself.

The asphalt spec changed on page forty-seven. Of an addendum. Posted at four in the afternoon. Did your team catch it? BotBid did. It flags what changed, shows you before and after, and fixes your checklist and your dates. In minutes.

Paving and construction questions

Can BotBid read plan sets and bid schedules?

BotBid fetches the bid documents, keeps every version and lists the requirements it finds as suggestions. A person confirms each one. Your estimators still do the takeoff.

Does BotBid track bonding capacity?

Your bonding and insurance details live in the company profile with their expiry dates. Bids that ask for a bond list it as a must-have until someone marks it met.

Who approves the price, signature and submission?

Always a person on your team with the right to do it. BotBid prepares and checks; it never sets a final price, signs or hands a bid in.

Give bidding a department.

See BotBid on a full sample workspace: the Radar, a live bid plan, Ask BB, the bid writer and pre-flight. We will tailor the walkthrough to what you sell and who you sell it to.

  • A person at BotBid reviews every request and walks you through.
  • Sample data only: fictional companies, bids and people.
  • Price, signatures and submissions always stay with your team.